Release Coordination

This page acts as a status whiteboard for this release of Haiku. It should contain a list of tasks that need to be completed.

Task List

This is a list of tasks that need to be done in preparation for the alpha 2 release. Do you see a task that still needs someone to take care of it? Drop a line on the Haiku-Development mailing list.

Build Tasks

taskdueassigneenotes
Assign buildmeister - mmadia
Determine distribution structure - -
Determine optional packages to be included 2011-05-23 - same as Alpha2 - OptionalPackages tracking page
Set up a test framework/formal list of requirements - -

Release Preparation

taskdueassigneenotes
Find (additional) mirrors -
Prepare torrents -
Write release notes - everyone ReleaseNotes
Write press release - -
Determine press plan - -

Website

taskdueassigneenotes
Update front page artwork - -
Update download graphic, WonderBrush Graphic Release Date - See hrev36635 for where to install file
Update/New Screenshots for Slideshow - -
Sync User Guide - -
Sync Welcome pages - -
Sync Release Notes - - ReleaseNotes
Update get-haiku - can do if needed Current Version Information box, misc text
Merge mirror urls - -

Release

taskdueassigneenotes
Branch the source tree 2011-05-16 Adrien Destugues
Backport important bug fixes - -
Tag the final build - -
Make source available - - r1a3 source location
Test final build - -
Distribute final build to mirrors - -
Distribute final build via torrents - -

Note, dates are in yyyy-mm-dd format.

Release Schedule

  • Branching trunk : 2011-05-16
  • Tagging branch : -
  • Final testing after tagging branch : -

The testing of the build is expected to take a few days (pending any unforeseen problems). The website team will also require a few days to upgrade the website in order to support the release. The expected release date is around 2011-06-01.

Proposals

TODO

Status Updates

The status updates give an overview of the progress that is made towards this release.

Blocker issues

These need to be fixed in order to release the alpha.

No results

Total of 0 open ticket(s).

Critical issues

If all the blocker items are resolved, these should be evaluated whether or not they block the alpha release.

No results

Total of 0 open ticket(s).

High priority issues

This is a list of items with things that would be very much appreciated for this release, but they will not delay the release.

No results

Total of 0 open ticket(s).