Release Coordination
Current Task: | Final feature additions
|
Release: | R1, Beta 1
|
Target ship date: | TBD
|
Primary Release Coordinator: | TBD
|
Secondary Release Coordinators: | TBD
|
Release Coordinator Pool
The Release Coordinator for R1B1 is currently TBD.
This is a list of people who have shown interest or who have acted as release coordinators in the past.
- Augustin Cavalier (waddlesplash)
- Adrien Destugues (PulkoMandy)
- Alexander von Gluck IV (kallisti5) - History: R1A4, R1A4.1
- Ryan Leavengood (leavengood) - History: R1A3
- (Are we missing anyone?)
Tentative Schedule
None
This page acts as a status whiteboard for this release of Haiku. It should contain a list of tasks that need to be completed.
Task List
This is a list of tasks that need to be done in preparation for the R1, Alpha 5 release. Do you see a task that still needs someone to take care of it? Drop a line on the Haiku-Development mailing list.
Initial Planning
task | due | assignee | notes | status
|
Finalize release date | n/a | - | - | -
|
Assign testers to components | - | - | -
|
Software testing team
Component | Assigned | Notes | Results | Pass/Fail
|
BeOS Applications | - | Download random BeOS apps and try to run them keeping a list of issues | - | -
|
Package Management | - | - | - | -
|
Random application testing | - | boot up, do random tasks in 15 minute sessions | - | -
|
Random application testing | - | boot up, do random tasks in 15 minute sessions | - | -
|
WebPositive | - | Holding off Web+ updates until post-branch | - | -
|
Hardware testing team
Component | Assigned | Notes | Results | Pass/Fail
|
Desktops | - | 3 - 4 desktops of random generations | - | -
|
Desktops | - | - | - | -
|
Graphics Cards | - | - | - | -
|
Laptops | - | - | - | -
|
Laptops | - | - | - | -
|
Wireless network connectivity | - | - | - | -
|
Wired network connectivity | - | - | - | -
|
Build Tasks
task | due | assignee | notes
|
Assign buildmeister | - | - | -
|
Determine distribution structure | - | - | -
|
Testing | - | everyone | perform testing of potential R1B1 candidate
|
Release Preparation
task | due | assignee | notes
|
Find (additional) mirrors | - | - | -
|
Prepare torrents | - | - | -
|
Write release notes | - | - | -
|
Write press release | - | - | -
|
Determine press plan | - | - | -
|
Website
Release
task | due | assignee | notes | status
|
Branch the source tree | - | - | - | COMPLETE
|
Backport important bug fixes | - | - | - | IN PROGRESS
|
Tag the final build | - | - | - | TODO
|
Make source available | - | - | r1a5 source location | TODO
|
Distribute final build to mirrors | - | - | - | TODO
|
Distribute final build via torrents | - | - | - | TODO
|
Note, dates are in yyyy-mm-dd format.
Tickets
- Blockers *must* be fixed before the release
- Critical items should be evaluated if all the blockers are fixed
- High items could be fixed but are not required.
Milestone: R1/beta1