Version 2 (modified by 5 years ago) ( diff ) | ,
---|
Release Coordination ¶
Current Task: | Final bug-fixing |
Release: | R1/beta2 |
Target ship date: | May 31, 2020 |
Primary Release Coordinator: | Augustin Cavalier (waddlesplash) |
Secondary Release Coordinators: | Niels Sascha Reedijk (nielx) |
Tentative Schedule ¶
See R1/Beta2/Timeline.
Task List ¶
This is a list of tasks that need to be done in preparation for the R1, Beta 2 release. Do you see a task that still needs someone to take care of it? Drop a line on the Haiku-Development mailing list.
Initial Planning ¶
task | due | assignee | notes | status |
Software testing team ¶
Component | Assigned | Notes | Results | Pass/Fail |
BeOS Applications | - | Download random BeOS apps and try to run them keeping a list of issues | - | - |
Package Management | - | Install random repo applications, keep track of any major issues or broken packages | - | - |
Random application testing | - | boot up, do random tasks in 15 minute sessions | - | - |
Random application testing | - | boot up, do random tasks in 15 minute sessions | - | - |
WebPositive | - | Holding off Web+ updates until post-branch | - | - |
Hardware testing team ¶
Component | Assigned | Notes | Results | Pass/Fail |
Desktops | - | 3 - 4 desktops of random generations | - | - |
Desktops | - | - | - | - |
Graphics Cards | - | - | - | - |
Laptops | - | - | - | - |
Laptops | - | - | - | - |
Wireless network connectivity | - | - | - | - |
Wired network connectivity | - | - | - | - |
Build Tasks ¶
task | due | assignee | notes |
Assign buildmeister | - | - | - |
Determine distribution structure | - | - | - |
Testing | - | everyone | perform testing of potential R1B1 candidate |
Release Preparation ¶
task | due | assignee | notes |
Find (additional) mirrors | - | - | - |
Prepare torrents | - | - | - |
Write release notes | - | - | - |
Write press release | - | - | - |
Determine press plan | - | - | - |
Website ¶
task | due | assignee | notes |
Update front page artwork | - | - | - |
Update download graphic, WonderBrush Graphic | - | - | - |
Update/New Screenshots for Slideshow | - | - | - |
Sync User Guide | - | - | - |
Sync Welcome pages | - | - | - |
Sync Release Notes | - | - | ReleaseNotes |
Update get-haiku | - | can do if needed | Current Version Information box, misc text |
Merge mirror urls | - | - | - |
Release ¶
task | due | assignee | notes | status |
Branch the source tree | - | - | - | TODO |
Backport important bug fixes | - | - | - | TODO |
Tag the final build | - | - | - | TODO |
Make source available | - | - | r1b1 source location | (_source packages in repos?) |
Distribute final build to mirrors | - | - | - | TODO |
Distribute final build via torrents | - | - | - | TODO |
Note, dates are in yyyy-mm-dd format.
Tickets ¶
Milestone: R1/beta2
Blocker issues ¶
These need to be fixed in order to release the beta.
No results
Total of 0 open ticket(s).
Critical issues ¶
If all the blocker items are resolved, these should be evaluated whether or not they block the beta release.
No results
Total of 0 open ticket(s).
High priority issues ¶
This is a list of items with things that would be very much appreciated for this release, but they will not delay the release.
No results
Total of 0 open ticket(s).